Quantcast
Viewing all articles
Browse latest Browse all 9656

Re: inspection plan copying

Hi,

 

     There are 2 options of creating a inspection plan with reference

 

  1. Copying an existing group
  2. Assigning to a existing group

 

     The first one means that you are just copying the header, operations and MIC etc..from the existing group (ABC). The group is used as reference and will not be copied to the new group (EFG)

 

     The second option means that you are directly assigning the material to that group (ABC). So the system will not create a new group (EFG).

 

Regards,

Krishna Chandra


Viewing all articles
Browse latest Browse all 9656

Trending Articles