Hi Kumar,
To answer both of your questions:
Q) What I have seen, when the TO (created w.r.t Inbound delivery) is confirmed, the destination storage bin and storage type gets updated with the positive stock. This means, that WM is updated with stock, when in fact, stock has not physically arrived ..... it sounds wrong. what I am missing?
A) WM stock is indeed updated in the destination bin with the positive quant and it is available to move within WM. However, the stock doesn't exist in IM yet so it can't be picked for any outbound process - just moved internally. Also, just to clarify, the negative quant is generated in the interim storage type first of all when the putaway is created. Once the actual GR occurs, it will automatically remove this stock from the negative quant and this is checked in the movement type config. This will result therefore, only on GR, that the stock has "increased" in WM.
Q) Since the TO creation and confirmation happens before GR, if it is found after physcial receipt of goods, that actual delivered quantity is different than Putaway qty, then how we adjust it?
If , at this stage, we go to Inbound del doc and try to change the del. qty , then system gives a hard error and prevents post goods receipt.
A) If the case is that the delivered quantity is greater than the quantity already putaway, a new inbound delivery can be created in order to putaway this new material. If this is not an option, the existing TO can be cancelled via transation LT0G (as long as the storage location is not HU maanged) and then modify the inbound delivery quantity.
It is also possible to modify the delivery quantity if the GR hasn't been posted, even if the TO is confirmed. What error are you seeing?
Regards,
Sinéad Curran