Quantcast
Viewing all articles
Browse latest Browse all 9656

Re: why system is updating standard cost of RM

Dear Kaushal

 

It is standard behavior of SAP that it costs all material inside the BOM while doing Costing run.

Please tick "DO NOT COST" check box in costing 1 tab of all RM (ROH) material master. And then run Standard Cost Estimate for your FERT or HALB materials. RMs will not be costed during run.

 

Don't worry their MAP will be considered in standard price calculation of FERT or HALB materials.

 

Regards

 

Rajneesh Saxena


Viewing all articles
Browse latest Browse all 9656

Trending Articles