Hi Ramin,
First of all thanks for the reply. Actually my PM asked me to change the cost center on framework PO.I block the original line item then add the line U enter GL code & new cost center but after saving the PO its back to original cost center. Any idea or I need to open new PO.
Thanks,
Zain