Hi Seb,
Thanks for your reply.
I have following queries:
1. Should I be using IP43 as suggested by you or IP01 (which has a check box "Multiple Cntr.")?
2. I am unable to release the plan so created (using IP43). I am getting a system response "Release not possible as MaintPlan already released, called or skipped". I am confused as I tried to "release" the plan without having created any other transaction related to it.
3. How do I enter the ACTUAL time elapsed (of the running hours) of the DG set into the system? It will always happen because the actual running hours will differ from the estimated value used while creating the counter (due to operational reasons). Supposing there are four DG sets and I have equally divided total estimated running hours between then while creating counter for each of them. Now say, one of the DG sets is down due to turn around or for some other reason. In such a case the no. of hours of actual running for the rest would increase. How to enter the additional running hours into the system so that the trigger for the preventive maintenance (i.e. the B Check) would be earlier than that calculated by the system when based on the original estimated running hours value.
I hope I being coherent. Any thought on this please?
Thanks