Hi
Have you assigned same costing sheet in both valuation variants meant for prod order plan and actual cost??
If yes, I see no reason other than that you might not have maintained actual overhead rate or the base itself is not available during actual
Actual overhead rate must be maintained at the same place as plan rate, with overhead type 2
Br. Ajay M